Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 397 of 9300

Document the BXH/BXLE/JXH/JXLE trick

An article in either the systems journal or the journal of RF&D described using BXH and BXLE to test 30 bits in succession. This trick is still valid and extends to 62 consecutive tests in AMODE64. It would be useful to have it in either the e...
9 days ago in IBM High Level Assembler for z/OS and z/VM / Other 1 Submitted

Enhancements required in DWC’s REST API for IWSz

1. Why are two separate TWS REST API calls required to retrieve the full job stream details? This approach is not recommended for DevOps practices. For example: Step 1: Execute the following call to retrieve the job stream ID:https://<DWC_Hostn...
16 days ago in IBM Z Workload Scheduler 0 Future consideration

R3BATCH return code been ignored on zCentric Agent workstations

The R3BATCH processing under a LWA / Dynamic Agent doesn't track SAP Extended Agent Batch return codes as per the functionality available under an FTA. When an extended agent RC is returned by SAP by including the following functions into SAP Job ...
22 days ago in IBM Z Workload Scheduler 0 Planned for future release

WAPL: modifying all operation in an occurence at once

In contrast to IWSBATCH/CP (a tool from Horizont-IT) in WAPL it is not possible to modify all operations in an occurance with one command at once. The try was quitten with EQQY713E REQUIRED ARGUMENT OPNO MISSING IN MODIFY REQUEST FOR RESOURCE CPOP...
about 1 month ago in IBM Z Workload Scheduler 0 Under review

ETT Job Triggering should consider destination

This idea relates to the topic of ETT triggering based on jobs that run on a system not under zWS control. Especially in larger environments with multiple zWS trackers connected to the controller, it would be necessary to consider for ETT job trig...
about 1 month ago in IBM Z Workload Scheduler 0 Future consideration

Password spray alerts various sources

zSecure Alert is uniquely equipped to capture events and circumstances at near real-time and can serve as an early alert for such incidents as password spraying from external sources. The identification of an attack from external sources (SSH and ...
2 months ago in zSecure / zSecure Alert 0 Under review

Recommended procedure for relocating zWS databases and datasets (changing dataset names)

Sometimes it's necessary to change the dataset names of a zWS installation due to changes in the dataset naming conventions or migration of zWS datasets from non-SMS-managed volumes to SMS-managed volumes. Unfortunately, I cannot find any recommen...
2 months ago in IBM Z Workload Scheduler 1 Not under consideration

Produce message for NOT STARTED ALERT (EQQE150) even if NOT STARTED ACTION is coded at the same time

The NOT STARTED ALERT message EQQE150 is currently not produced if the NOT STARTED ACTION is coded at the same time. Some users want to be notified when the NOT STARTED ACTION is performed, hence the interest in having a specific message produced ...
3 months ago in IBM Z Workload Scheduler 0 Future consideration

Ability to Add New Application Level User Field to Existing AD in Workload Scheduler

Description:Currently, when using the ADUSF option, IBM Workload Scheduler creates a new Application Description (AD) with the same name instead of adding the User Field to the existing AD. Additionally, ADUSF requires attaching the user field to ...
3 months ago in IBM Z Workload Scheduler 0 Future consideration

Restart/Cleanup functionality with Stepreschk (YES) to allow more flexibility at step Restart, similiar to Stepreschk(no) with allowing DDNEVER functions

It aligns to competitive products that a client might be using today and provides them with the ability to manage the restart steps they decide to choose without the need to replace their current JCL.
3 months ago in IBM Z Workload Scheduler 0 Planned for future release