Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

IBM Z Workload Scheduler

Mirroring - Extending the maximum allowable hostname length

This RFC requests extending the maximum allowable hostname length for the Federator initialization parameters (MIRROPTS). The current limitation of 52 characters prevents compliance with enterprise Fully Qualified Domain Name (FQDN) naming standar...
1 day ago in IBM Z Workload Scheduler Future consideration

Dynamic Workload Console: Add SSL connection for DB2 z/OS database

Today it is not supported to run dbsslconnection true for DB2Z database for the DWC and I would like it to be added. Dynamic Workload Console installation - dwcinst script - IBM Documentation --dbsslconnection true | false Enables or disables the ...
18 days ago in IBM Z Workload Scheduler
162 VOTE

TWS High Availability

We are working with high availability in the customer's datacenter, so tests were done with TWS simulating an lpar outage where TWS was active in a sysplex. The standby controller takes over work correctly for new jobs that are submitted, but jobs...
over 5 years ago in IBM Z Workload Scheduler Future consideration

Auditing of events caused by EQQEVPGM

Currently, actions triggered via EQQEVPGM are not logged in the audit log in a way that makes them clearly traceable. Take, for example, an SRSTAT in the following form: Application : IZWSP#TRK#TEST01 z/OS TWS Tracker Test Operation : IZT7 50 zOS ...
5 months ago in IBM Z Workload Scheduler Future consideration

Automated Agent Unlink and timeout functionality from domain manager incase of communcation failure between doman manager and FTA

In our environment, a prolonged unlink of a FTA can adversely affect all other agents within the same mailman group. With hundreds of servers undergoing daily patching and scheduled reboots, this issue frequently arises. Investigations have reveal...
4 months ago in IBM Z Workload Scheduler Not under consideration

Unloading XDeps from zWS Version 10.2 via WAPL must include the new field 'Resolution Criteria'

Unloading XDeps from zWS Version 10.2 SPE3 via WAPL is incomplete: the new field 'Resolution Criteria' is missing in output. This must be implemented to have a full/complete WAPL functionality.
about 1 month ago in IBM Z Workload Scheduler Planned for future release

The list returned by ISPF DEPX command should automatically update to reflect the current situation, excluding any remote shadows that have been deleted.

The DEPX list must stay up‑to‑date so that developers and operators always see the current set of remote shadows; stale entries can lead to incorrect impact analyses and cause jobs to fail when they reference deleted datasets. Automatically filter...
about 1 month ago in IBM Z Workload Scheduler Planned for future release

Ability to Add New Application Level User Field to Existing AD in Workload Scheduler

Description:Currently, when using the ADUSF option, IBM Workload Scheduler creates a new Application Description (AD) with the same name instead of adding the User Field to the existing AD. Additionally, ADUSF requires attaching the user field to ...
11 months ago in IBM Z Workload Scheduler Future consideration

NOPWAIT parameter: add 2 additional options SR (special Resource) and Time

Currently NOPWAIT has 2 possible options: Specify YES if an operation that you are NOPing will be actually NOPed after that time dependencies and special resources, if any, are resolved. The default is NO, meaning that the operation is NOPed immed...
26 days ago in IBM Z Workload Scheduler

Use VSAM system managed buffers (SMB) instead of LSR to reduce the CPU consumption by the controller task by around 40%

zWS has used   LSR (local shared resources) for some of its VSAM files for decades, but recent analysis by the VSAM and PERFORMANCE teams related to a customer case indicated that there could be significant CPU savings if SMB were implemented...
about 2 months ago in IBM Z Workload Scheduler Planned for future release