Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 256

TWS product development to support zcentric agents in a Natted environment

Need to be ableto support Zcentric agents in a Natt'd enviroment.
almost 7 years ago in IBM Z Workload Scheduler 0 Future consideration

Specify relative time for Operation Not Started alerts

The Operation Not Started Alert/Action options were useful enhancements to IBM Z Workload Scheduler V9R5. But they can't be used in all scenarios. We have IzWS applications that run multiple times daily at random times usually event triggered (e.g...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Enable a confirmation panel after the TWS panel EQQMEP1L (5.4)

We need to enable a confirmation panel after the TWS panel EQQMEP1L (5.4) to complete a job with an error state. Currently, there is no post-EQQMEP1L confirmation panel that requires you to verify a job data before completing your job. Because of ...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Povide a fix for ZWS V9.5 to issue error message when an LTP occurrence is not created due to incorrect use of SHIFT function

The SHIFT function related problem occurred during a testing by client. In summary, an LTP occurrence was not created because the client used SHIFT function incorrectly. (Please refer to case# TS003497942.)However, ZWS V9.5 issued neither error no...
over 4 years ago in IBM Z Workload Scheduler 0 Planned for future release

Add database fields for DWC reporting

We are currently planning to replace a homegrown system which creates TWS reports, with DWC reporting feature. However, we are missing a mandatory field from the Current Plan z/OS DB2 archive database, which is the AD Owner ID. Our current system ...
over 4 years ago in IBM Z Workload Scheduler 0 Future consideration

DWC Event Rules Jobstream Triggering

Using DWC Event rules with FileCreate, when the user drops 3 files on the folder simultaneously, it triggers and adds 1 job stream in zOS controller but the other 2 error out in DWC with message - Error AWSZAP002E Submission of job stream "QTG1MAR...
about 7 years ago in IBM Z Workload Scheduler 1 Planned for future release

Need new column/field for ACTUAL_JOB_END

When running a historical, statistical, or custom SQL there is no column in either historical or Statistical tables for listing the ACTUAL_JOB_END which would be similar to the ACTUAL_JOB_START field. We would like to see an ACTUAL_JOB_END field a...
over 4 years ago in IBM Z Workload Scheduler 0 Planned for future release

Avoid CP EXTEND failure if LRECL of EQQTROUT is smaller than 32756

After migrating from IWSZ 9.3 to zWS 9.5 the current plan extend job (PGM=EQQDNTOP) suddenly began to fail with a message:IEC036I 002-18,IGC0005E,jjjjjjjj,DNTOP,EQQTROUT,uuuu,vvvvvv, dsname It was not clear that the problem was due to the LRECL of...
over 3 years ago in IBM Z Workload Scheduler 0 Planned for future release

Panel EQQAMTMP "not started action" cannot be used with "EVERY" repeating jobs

Jobs that are scheduled using the EVERY repeat Run-Cycle Option do not have an operation start/end time in the database entry. When the schedule is interrupted by some event and none of the jobs run for several cycles, it would be useful to have I...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Selection Panel for CALENDAR and PERIOD

IWS offers selection panels in database panel for WS, AD, OI, SPECRES, EDWA, JD, JCLVAR and RUN CYCLE. Two selection panels are missing: PERIOD and CALENDAR. In enviroments with hundreds of periods or calendars a selection menu like the other sele...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration