Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 184

Correct the handling of an EQQJTARC file full (SB37 abend) to ensure that job tracking records are not lost, and jobs are not submitted twice

Currently, if the EQQJTARC file becomes full, immediately the zWS JT ARCHIVER subtask fails (message EQQZ045E SUBTASK JT LOG ARCHIVER ENDED UNEXPECTEDLY) however it is still possible to write job tracking (JT) records to the JT files which are not...
over 1 year ago in IBM Z Workload Scheduler 2 Future consideration

Add SHIFT and SHIFTDAYTYPE to WAPL LIST GENDAYS

With WAPL, the LIST GENDAYS can be used to generate the passage dates for a RULE. Unfortunately, SHIFT and SHIFTDAYTYPE cannot be encoded in LIST GENDAYS. So the dates determined are wrong. However, the GENDAYS for this interactive RULE does take ...
over 1 year ago in IBM Z Workload Scheduler 1 Future consideration

DWC should not be installed in z/OS UNIX in a zFS filesystem with read/write access

Within the current design, we would like to see a clear segregation between the files which REQUIRE write access from the files for which READ access would be sufficient, within the "USERDIR" directory. The standard executables should be delivered...
10 months ago in IBM Z Workload Scheduler 0 Future consideration

Allow TWS to cancel jobs it has submitted early

There's a new feature to allow TWS to submit jobs early to the systems, however as soon as it does then if a decision is made to not execute the job it needs to be done on the system, which would require giving additional RACF access. It would be ...
5 months ago in IBM Z Workload Scheduler 0 Future consideration

IWSz Upgrade with zero downtime

Last weekend we migrated IWSz from V9R3 to V9R5.The complete migration took about 1h to complete. Due to the unavailability of IWSz there was some impact on critical batch processing with frequencies smaller than 1h. Today's business requirements ...
about 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Encrypting TWS Zcentric workstation password on Mainframe

Encrypting TWS Zcentric workstation password on Mainframe. Currently we have Set of TWS workstation ID and password saved in PARMFTA userinfo dataset on mainframe to connect to connect to zcentric workstation pn windows This userid and password is...
almost 2 years ago in IBM Z Workload Scheduler 1 Future consideration

Clean up type (CLN_Ty) in Error Handler Layout (1) doesn’t provide enough details or (2) wasting spaces on Error hander layout

Hello, Clean up type (CLN_Ty) can be set on he TWS error handler layout – see PIC1. It can have 4 values: A (Automatic), I (immediate), M (Manual), N (None) – see PIC2. This CLN_Ty uses 6 characters from the Layout. I would like to suggest two/thr...
almost 2 years ago in IBM Z Workload Scheduler 1 Future consideration

Options to reduce report created by LTPMA or LTP extend

Running LTPMA (Long Term Plan Modification All) or extend LTP job, does not give you any option to reduce output from LTP. We would like options to reduce the output from these jobs.
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Integration with CDP in a configuration with a standby controller

We use a standby controller and we want to use the CDP whit it running but now is not supported. This is why we request to integrate CDP with standby controllers
over 2 years ago in IBM Z Workload Scheduler 0 Future consideration

Fixing and adding additional fields in DWC metrics

Hi Team, Currently, After activating the configuration file TWSZOSMetricsConfig.properties, DWC metric portal is exposing job metric values. But, It is showing job number value in the job name field. We have checked with vendor and they mentioned ...
7 months ago in IBM Z Workload Scheduler 0 Future consideration