Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 224

Modify Status Command gives no response to the Requester

Via our System-Automation we monitor the TWS-Trackers and the TWS-Controller. Every hour the status of the systems is retrieved via the modify status command. The output of the command is only written to the syslog. The requester gets no response....
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

change in the behavior of SMOOTHSUBRATE

We have evaluated the use of smoothsubrate in our workload. many thanks for your explanation in the case TS009434150 The current function with the SMOOTHSUBRATE parm is not appropriate for our use, because 1. All workstations (incl general worksta...
5 months ago in IBM Z Workload Scheduler 0 Future consideration

Add new function to collect version/release of Zcentric agent

Add a new function to collect information in mass mode (like utility or batch) or exploit information available in EQQSWIZC panel to view (in one shoot) version/release of all Zcentric agents defined to IWS controler
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Support EQQMINOx to be invoked via LIBDEF (run zWS dialogs for different versions in parallel)

Unfortunately EQQMINOx is NOT supported to be invoked via LIBDEF because of the way that EQQMINOx is loaded -- there is an old DOC APAR concerning this which is STILL true even today-APAR= PK53014 SER= DD DOCLIBDEF FOR ISPLLIB DOES NOT WORK FOR LO...
about 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Ability for zcentric agents to flow through a gateway to the Z Controller

This will allow client connections to the zController with zcentric to directly connect through a NAT IP (gateway) and not via a DDM. This will simplify set up and connections with the zcentric agent.
5 months ago in IBM Z Workload Scheduler 1 Future consideration

The communication between DWC & DB2 (any RDBMS) needs to be encrypted)

When using the DWC for querying the Historical or Statistical tables the communication should be configurable to use encryption - TLS.
over 2 years ago in IBM Z Workload Scheduler 0 Planned for future release

IzWS allow user to add non-existing predecessor which should have more alert on the warning like pop-up warning that required enter to confirm.

IzWS allow user to add non-existing predecessor which should have more alert on the warning like pop-up warning that required enter to confirm. We would like to request if the predecessor job does not exist thenoption1 : to have confirmation with ...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Include User Fields in DWC Monitor Workload job column.

We need to have a column in DWC with the user field enabled in Monitor Workload (job and critical job). This column should be editable to write and see comments about the job manage. In ISPF pannel this field can enable in handling error pannel, s...
about 3 years ago in IBM Z Workload Scheduler 3 Future consideration

Provide easy method to do a migration from a very old zWS release (example 8.6) to a newer one (example 9.5 or 10.1)

Currently, program EQQICTOP cannot be used to migrate FROM certain releases to other RELEASE. For example you cannot migrate from 8.6 to 9.5 in a single run of EQQICTOP, but you can migrate from 8.6 to 9.3 using an invocation of a 9.3 level of EQQ...
5 months ago in IBM Z Workload Scheduler 1 Not under consideration

AT-TLS SUPPORT FOR TWS FOR Z/OS

AT-TLS is not yet declared as supported for IBM Workload Scheduler for z/OS.This support is required.
over 4 years ago in IBM Z Workload Scheduler 0 Planned for future release