Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 1720

ETT Trigger Feature

A lot of different companies I´ve talked with have problems with excessive ETT Triggering where there are so many triggers you go over the length of your current plan. I think it would be very appreciated to have some new kind of ETT triggering fe...
6 months ago in IBM Z Workload Scheduler 0 Future consideration

Allow calculation of "OCLASTC" variables for months in the future

Currently, we can calculate the last calendar day with OCLASTC. From time to time it is needed to calculate the last calendar day of +1M or even more. According to these documentations, it is not valid to just calculate +1M to OCLASTC and the beha...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Filter option for displaying fields in the Test Case Editor

In the Test Case Editor, all fields defined in the program and/or in the Copybook are displayed. Both the referenced and the unused fields are presented, which leads to the fact that with a compatible extension of Copybooks (and thus to a multipli...
about 1 month ago in Test Accelerator for Z / Early Development Testing for z/OS 0 Future consideration

Add the LSPR workload type to the CP CEC Usage Analysis report - Report number CPCPU01

Currently in the CP CEC Usage Analysis report - Report number CPCPU01 we notice that the CEC MIPS rating changes/fluctuates e.g. 3931-710 has 18788 MIPS according to the IBM LSPR table. However during certain intervals, we notice the MIPS drop to ...
4 months ago in IBM Z Performance and Capacity Analytics 1 Future consideration

Add MQ Version to OMEG MQ entry panel KMQSTRTI

We operate MQ subsystems in different versions To have an overview on which MQ version level a system is, we would like to see this in Panel KMQSTRTI - IBM MQ Queue Manager Status (displaycols, sortcols and filtercols). p.e. MQVERSION from table K...
5 months ago in IBM OMEGAMON for Messaging on z/OS 0 Future consideration

Add an option to use IBGENER to copy files using DCP

To use IBGENER to copy some files that is having problem using the regular DCP command, good example is the SYSDEBUG/SIDEFILE output from PLI or Cobol compiler to use with File Manager or Debugger.
6 months ago in Z Open Automation Utilities 0 Future consideration

Enabling X-command (Export and Import Applications) in advanced panels

Export and Import Applications from the dialog (1.4.3) makes it easy and fast to export applications and even to import them fastly to another system. However it is only available in the _old_ panel style. The Export and Import Applications (X-Com...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Create an option for manual control of job late starts for email alerts.

This is useful because we have over 150 batch jobs that will not get a correct LST from the algorithm that runs when we extend the current plan daily. This would benefit anyone who is having problems with the algorithm or want's a late start email...
4 months ago in IBM Z Workload Scheduler 0 Future consideration

Support outbound CICS --> REST API (OpenAPI v3) calls using a containerized solution on OpenShift

Currently the exposure of OpenAPI 3 REST APIs inbound to z/OS is supported on openshift x86 containerized architecture. Outbound calls from CICS to the REST API (OpenAPI v3) instead require the runtime to be installed on z/OS. This generates a dup...
about 1 year ago in z/OS Connect 0 Future consideration

Option to prevent inadvertent use of LINKAGE-SECTION data items prior to establishing addressability

In a COBOL program, the LINKAGE SECTION is used to describe data structures that are made available to this program from another program or method. Addressability to these data structures are established in a variety of ways, such as via reference...
over 1 year ago in COBOL Compilers / z/OS 9 Future consideration