Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 262

Possibility to execute procedures in Snowflake and other plugins

Email from customer: Do you know if it should be possible to execute procedures in Snowflake (From DWC/IWS ) ?? Like this : call COMMON_DATA.SP_CREATE_PRODUCT_TYPE_MAPPING_VIEWS(); Contacted PlugIns team: The procedures cannot be executed, in plug...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

To implement the REFRESH RACF command via PIF/OCL o WAPL function.

To activate RACF sub resources, only option 9.6 in TWS is available. There are chances to use 9.5 mistakenly. To avoid this, if there is an option in WAPL or PIF, it would be more usefull. Raised case for this, i was suggested to refresh RACF reso...
over 5 years ago in IBM Z Workload Scheduler 3 Future consideration

Change IWS Reporting of User Abends as Hex Values to true User Abend Decimal Values

User abends are often bigger than 3 numbers and error codes in IWS are 4 digits. The first digit for a User error is "U" to show it's not a condition code, but now there are only 3 digits for a 4 digit code. So, IWS turns the decimal number to a h...
8 months ago in IBM Z Workload Scheduler 1 Future consideration

Need to filter on Jobs that are NP - NOP oper

There is a need to filter on operations that have been set to NP in panel ID EQQSOPFP. This would be much like filtering on operations set to MH (Manual Hold) NP - NOP (no operation). IWSz will set the status of the operation to complete when the ...
about 7 years ago in IBM Z Workload Scheduler 0 Planned for future release

Improve the interface between zWS and CDP so that CDP continues to work with zWS if the USS filesystem is moved or restarted on a different LPAR (AUTOMOVE)

There are 3 inter-related requests here all for CDP/zWS interface (parameter CDP(YES): (1) a command to force a SWITCH of the CDP logs (similar to what is available for the SWITCHMLOG) (2) a command to force the CDP interface to start up again (wi...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Cross Dependency: "Real Time" status in shadow Job

If we use automatic recovery statements (e.g. to insert a new application as new predecessor) the workstation status of shadow jobs don't change from E to W. IWS changes the status of the shadow job after the recovery action is completed (the new ...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

WorkStation Not Reporting But "submit-NO'

Like a case TS016443942 we need to have a Not Reporting workstation but that possible to put "submit no"For example when the operator must manually stop a plan "halfway"where the plan has a "non-reporting workstation" as the successor of the first...
8 months ago in IBM Z Workload Scheduler 1 Not under consideration

Putting module EQQSSCNMx above the line

Due to administrative rules we are forced to run multiple IWSz Systems in parallel on one SYSPLEX. When migrating IWSz we are using BUILDSSX REBUILD and SSCMNAME TEMPORARY to avoid IPLs. After migration we are restarting IWSz with SSCMNAME PERMANE...
over 4 years ago in IBM Z Workload Scheduler 0 Future consideration

One Tracker per LPAR serve all Controller

Due to administrative rules we are forced to run multiple IWSz Systems in parallel on one SYSPLEX. So we have to start tracker STCs for each of our multiple IWSz controllers on every system of the SYSPLEX. As the tracker STCs all do the same work ...
over 4 years ago in IBM Z Workload Scheduler 0 Future consideration

SUBSTR JCL command should support variables with up to 44 chars or allow a continuation with the SETVAR directive

It should be possible to process up to 44 digits within a SUBSTRING command or to allow a continuation within the SETVAR directive. Variables with a value with up to 44 characters are not supported with the SUBSTR JCL function.
almost 9 years ago in IBM Z Workload Scheduler 0 Future consideration