Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 227

Simplify verification of occurence/operation status after performing a CP REFRESH (dialog option 9.5) by having an available copy of the pre-refresh files on a separate controller

Currently it is very difficult to get all the occurrences and operations in the current plan (CP) into the correct status after it is necessary to perform a REFRESH of the long term plan (which deletes the current plan). In fact it is so difficult...
11 months ago in IBM Z Workload Scheduler 0 Future consideration

Improve JOBREC to include RESTFUL Web Services

Today, it's impossible to call a RESTful web service via Z/OS agent (Zcentric) using /JOBREC card.To do this, we must use DWC specific plugin or call the web services via a script.
over 7 years ago in IBM Z Workload Scheduler 1 Not under consideration

Allow current plan to be automatically rebuilt with correct status information after a refresh of the plan (dialog option 9.5)

Currently it is possible to recreate the current plan from the long term plan after a CP refresh, with loss of all status information. However many customers add most of their worklad dynamically, and dynamically added occurrences are not handled ...
11 months ago in IBM Z Workload Scheduler 0 Future consideration

Completing occurrences via batch (WAPL, BCIT, etc ) should not delete predecessors without a warning or a special parameter to indicate that it is OK to delete predecessors

If occurrences are set complete via the ISPF dialog or from the DWC, there is a warning given if there are predecessors which are not completed. When doing the same thing via batch, the predecessors are just deleted which can make the current plan...
11 months ago in IBM Z Workload Scheduler 0 Future consideration

EQQUSIN expand job number field and add duration in 100th*sec

Actually the EQQUSIN has a duration limit of 99 hours 59 minutes. We have external jobs with longer durations and need the exact duration in tools like Xinfo. As described in the documentation, the ACT_DUR field has a CHAR size of 4. Updating oper...
12 months ago in IBM Z Workload Scheduler 0 Planned for future release

View reports created by other users

in workload scheduler, under reporting, my earlier colleague had created some reports. as the owner was different, I am not able to view those reports. I would like to take your help to modify the owner of those reports to my name so that I will b...
12 months ago in IBM Z Workload Scheduler 0 Future consideration

Specify relative time for Operation Not Started alerts

The Operation Not Started Alert/Action options were useful enhancements to IBM Z Workload Scheduler V9R5. But they can't be used in all scenarios. We have IzWS applications that run multiple times daily at random times usually event triggered (e.g...
almost 3 years ago in IBM Z Workload Scheduler 0 Future consideration

DSECT should be documented in COBOL

Serviceability
almost 5 years ago in IBM Z Workload Scheduler 0 Planned for future release

Enhance Long Duration Alert Message Information for Usability

The Long Duration alert message should be enhanced to provide additional information that will assist in quicker assessment and analysis. Additional information requested to add to the message:* Run Cycle * Job start time* Jobs estimated duration*...
about 7 years ago in IBM Z Workload Scheduler 0 Future consideration

Avoid CP EXTEND failure if LRECL of EQQTROUT is smaller than 32756

After migrating from IWSZ 9.3 to zWS 9.5 the current plan extend job (PGM=EQQDNTOP) suddenly began to fail with a message:IEC036I 002-18,IGC0005E,jjjjjjjj,DNTOP,EQQTROUT,uuuu,vvvvvv, dsname It was not clear that the problem was due to the LRECL of...
about 3 years ago in IBM Z Workload Scheduler 0 Planned for future release