Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 255

Allow calculation of "OCLASTC" variables for months in the future

Currently, we can calculate the last calendar day with OCLASTC. From time to time it is needed to calculate the last calendar day of +1M or even more. According to these documentations, it is not valid to just calculate +1M to OCLASTC and the beha...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Create an option for manual control of job late starts for email alerts.

This is useful because we have over 150 batch jobs that will not get a correct LST from the algorithm that runs when we extend the current plan daily. This would benefit anyone who is having problems with the algorithm or want's a late start email...
3 months ago in IBM Z Workload Scheduler 0 Future consideration

Enabling X-command (Export and Import Applications) in advanced panels

Export and Import Applications from the dialog (1.4.3) makes it easy and fast to export applications and even to import them fastly to another system. However it is only available in the _old_ panel style. The Export and Import Applications (X-Com...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Add DWC userid (in addition to RACF userid) to EQQPH72I message

Currently the EQQPH72I message, displayed in the mainframe server task which communicates with the zconnector to get to a DWC, contains only the RACFUSER value from the USERMAP table. There may be multiple DWC userids which have the same RACFUSER ...
about 1 month ago in IBM Z Workload Scheduler 0 Under review

A new field for occurences with the original ADID

Workload (dynamic and static) increases rapidly and the end of the CP planning period got hit regularly. To avoid this issue some woradounds are needed and already supported by PIF. PIF (e.g. WAPL) can create an alias occurence ids. However, the o...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Extending the accuracy of the input arrival date time

Workload (dynamic and static) increases rapidly and the end of the CP planning period got hit regularly. To avaid complicated workarounds, the input arrival date time needs a better accuracy - at least to seconds. By increasiny the accuracy of the...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

EQQSERVER avoid 878 abend by limiting connections

The EQQSERVER uses memory under 16 MB. If many jobs use the EQQSERVER, we get an S878. To avoid downtime, the number of concurrent connections must be limited. The server task should reject or queue new incoming connections (e.g. a FIFO queue). To...
over 1 year ago in IBM Z Workload Scheduler 4 Future consideration

Support $ as first Charakter for variables when using WAPL

According to this: https://www.ibm.com/docs/en/announcements/z-workload-scheduler-101-extends-orchestration-capabilities-managed-file-transfer-enhances-operational-experience-ai-streamlines-workflows-definition-renewed-workload-designer?region=US ...
about 1 year ago in IBM Z Workload Scheduler 2 Future consideration

Need CDPz integration to support TWSplex with standby controller

Dear support, We Morgan Stanley mainframe team would like to adopt CDPz integration to collect real-time messages to analyze. In our environment we installed TWS as plex with both primary controller and standby controller. Currently we enabled CDP...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

EQQ messages for jobs NOPed and SR availability change

Dear IWSz development team, Due to batch monitor requirement, we're looking for EQQ messages for the circumstances: 1) When a job is NOPed. 2) When a job is Held. 3) When SR availability is changed, especially when SR is changed to AVAIL(YES) no m...
12 months ago in IBM Z Workload Scheduler 1 Future consideration