Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 242

Change IWS Reporting of User Abends as Hex Values to true User Abend Decimal Values

User abends are often bigger than 3 numbers and error codes in IWS are 4 digits. The first digit for a User error is "U" to show it's not a condition code, but now there are only 3 digits for a 4 digit code. So, IWS turns the decimal number to a h...
3 months ago in IBM Z Workload Scheduler 1 Future consideration

Setting restriction for updating job status changes in TWS CP

Please enable the prompt confirmation in TWS panel (5.3) for changing the job status. Currently, there is no prompt confirmation for changing the job status via 5.3 -> M (an operation) -> 6 (General) -> Update status . Due to this, human ...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Integration with CDP in a configuration with a standby controller

We use a standby controller and we want to use the CDP whit it running but now is not supported. This is why we request to integrate CDP with standby controllers
about 2 years ago in IBM Z Workload Scheduler 0 Future consideration

SUBJOBUSER to support control via RACF SURROGAT profiles

The SUBJOBUSER user field feature introduced by PH35729 allows IzWS operations to specify the submission user as the value associated with SUBJOBUSER. But there is no RACF validation of what is effectively surrogate user submission once the SUBJOB...
about 3 years ago in IBM Z Workload Scheduler 1 Planned for future release

WorkStation Not Reporting But "submit-NO'

Like a case TS016443942 we need to have a Not Reporting workstation but that possible to put "submit no"For example when the operator must manually stop a plan "halfway"where the plan has a "non-reporting workstation" as the successor of the first...
4 months ago in IBM Z Workload Scheduler 0 Under review

By default, disable activation of the operation user field “SUBJOB USER”.

introducing a feature like this with an APAR can easily go unnoticed. This could lead to a huge security breach, giving everyone the power to submit a job under ANYONES authority, if not protected by RACF using the user field to specifie the job s...
7 months ago in IBM Z Workload Scheduler 1 Planned for future release

Replace Workload Scheduler exits with build in functionality

We want to move away from assembler based product options and modifications to a modern approach with regular parameter files. This approach provides more agility, easier maintenance and easy transparency on used settings. This initiative is not l...
11 months ago in IBM Z Workload Scheduler 0 Future consideration

Convert zWS Exits to Parmlib

Due to the limited Assembler skills, it is becoming extremely difficult to maintain our multitude of zWS-related user exits. It would be beneficial to have the option of paramertising all zWS exits to allow us to remove our dependency on the legac...
over 1 year ago in IBM Z Workload Scheduler 2 Future consideration

Eliminate the TEMPORARY operand of parameter SSCMNAME as it is not necessary and causes many problems

Currently the SSCMNAME can be coded as (EQQSSCMx,TEMPORARY) or (EQQSSCMx,PERMANENT) where x is a subsystem suffix (for instance letter O for 10.1 release). However it is not necessary to have the TEMPORARY option as to go to the different release ...
8 months ago in IBM Z Workload Scheduler 0 Planned for future release

Make it easy to find the scripts needed to create the DB2 history database on a non-z/OS platform (UNIX, LINUX,WINDOWS)

Currently, the DB2 history file definitions for a database on z/OS DB2 are provided in SEQQSAMP while the skips needed for the other platforms are only available in a CD image (ISO) that can be obtained by ordering the zWS product via SHOP z SERIE...
8 months ago in IBM Z Workload Scheduler 0 Future consideration