Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

GDPS

Showing 192

GEO-494 (RABO Bank) GDPS should suspend mirroring after failing Hyperswap Resync

SUBMITTER SECTIONSubmitted by: Angela LabateSubmitters Company: Other Customer PUBLICRequirement Number and Title: GEO-494 (RABO Bank) GDPS should suspend mirroring after failing Hyperswap ResyncHomework Assigned: NoRequirement Category: GDPS/PPRC...
almost 9 years ago in GDPS 2 Not under consideration

GDPS CA: GDPS ROUTING SCRIPT can end timely and do not wait for the end of workload monitoring

During workload switch with GDPS ROUTING script, customer found that ROUTING script did not end as soon as the switch was completed. Customer opened the case and was reply that 'After the workload switch completion as shown in message GEO4560I, th...
over 4 years ago in GDPS 0 Future consideration

equest nature/scope is to update GDPS so that falsely generate GEO558I event does not trigger FREEZE

Performing other testing which produced a message id of GEO550I caused a freeze to occur. As this was not the actual GEO550I the text was not the actual issue. It appears that other message ID's could also cause similar executions.
over 5 years ago in GDPS 0 Planned for future release

GDPS/ACTIVE-ACTIVE ZDL proxy system should support a separate PAM from target production system

GDPS/Active-Active V1.7 is delivered to support Zero Data Loss solution which requests customer to create new proxy systems with the target product systems in the same Sysplex of Site B. Because the target end systems in site B have the same volse...
over 7 years ago in GDPS 1 Not under consideration

Graceful Switch should be able to restart at the point of last break

GDPS/A-A 1.7 does not provide capability to restart the switch process at the last break point for graceful switch and force switch. It only provide a WTOR when STOP QREP timeout. It is far from customer's requirements.
over 7 years ago in GDPS 0 Planned for future release

Improved autonomics for Lifeline Advisor automatic takeovers

Several customers have asked for the ability to identify scenarios where a Lifeline Advisor takeover can be done automatically without risk of having two primary Lifeline Advisors active at the same time.
over 7 years ago in GDPS 0 Planned for future release

Unique GDPS/A-A SDF Alert Deleted Message ID

For messages that result in GDPS/A-A raising an SDF alert in NetView (GEO1108E for example), when GDPS/A-A deletes the SDF alert It doesn't have a separate message ID to say "SDF ALERT HAS BEEN DELETED", it reuses the original alert's message ID. ...
almost 8 years ago in GDPS 1 Not under consideration

Report Latency on workloads with no connections

Where applications update multiple data sources (DB2 and VSAM) through a single set of connections, multiple workloads need to be defined but the connections can only be associated with one workload. In this case, a workload is defined without any...
almost 8 years ago in GDPS 1 Not under consideration

Supress Workload Switch in GDPS/A-A UI

In the case where there is shared data across multiple applications/workloads it may not be possible to implement the GDPS/A-A workload switch capability, since it would prevent access to the shared data by applications outside of the workload on ...
almost 8 years ago in GDPS 1 Not under consideration

Unplanned switch for workload groups

Any workload grouping capability delivered in GDPS/A-A should equally apply to un-planned switches. In particular, it should be possible to configure invokation of an unplanned switch of a workload group by responding to a single WTOR relating to ...
almost 8 years ago in GDPS 1 Not under consideration