Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 160

Allow calculation of "OCLASTC" variables for months in the future

Currently, we can calculate the last calendar day with OCLASTC. From time to time it is needed to calculate the last calendar day of +1M or even more. According to these documentations, it is not valid to just calculate +1M to OCLASTC and the beha...
7 months ago in IBM Z Workload Scheduler 0 Future consideration

Support $ as first Charakter for variables when using WAPL

According to this: https://www.ibm.com/docs/en/announcements/z-workload-scheduler-101-extends-orchestration-capabilities-managed-file-transfer-enhances-operational-experience-ai-streamlines-workflows-definition-renewed-workload-designer?region=US ...
7 months ago in IBM Z Workload Scheduler 2 Future consideration

Enable dynamic activation of CDP logging function after it was disabled

Dear developers, We enabled CDPz data collection function integrated within IWSz to have EQQ8006I (indicating the status change of jobs scheduled in current plan) message to feed our home grown web tool. But we met an issue - While the owning syst...
7 months ago in IBM Z Workload Scheduler 0 Future consideration

Improve the interface between zWS and CDP so that CDP continues to work with zWS if the USS filesystem is moved or restarted on a different LPAR (AUTOMOVE)

There are 3 inter-related requests here all for CDP/zWS interface (parameter CDP(YES): (1) a command to force a SWITCH of the CDP logs (similar to what is available for the SWITCHMLOG) (2) a command to force the CDP interface to start up again (wi...
8 months ago in IBM Z Workload Scheduler 0 Future consideration

Cross Dependency: "Real Time" status in shadow Job

If we use automatic recovery statements (e.g. to insert a new application as new predecessor) the workstation status of shadow jobs don't change from E to W. IWS changes the status of the shadow job after the recovery action is completed (the new ...
8 months ago in IBM Z Workload Scheduler 0 Future consideration

Options to reduce report created by LTPMA or LTP extend

Running LTPMA (Long Term Plan Modification All) or extend LTP job, does not give you any option to reduce output from LTP. We would like options to reduce the output from these jobs.
8 months ago in IBM Z Workload Scheduler 0 Future consideration

Enable a confirmation panel after the TWS panel EQQMEP1L (5.4)

We need to enable a confirmation panel after the TWS panel EQQMEP1L (5.4) to complete a job with an error state. Currently, there is no post-EQQMEP1L confirmation panel that requires you to verify a job data before completing your job. Because of ...
8 months ago in IBM Z Workload Scheduler 0 Future consideration

Another way for controlling access between IWSz and zCentric IWS-agent on distributed platform instead of using member in EQQPARM dataset.

An audit has revealed that some users have access to both userIDs and passwords for zCentric agent users when updating these in member in EQQPARM dataset.Even if we encrypt the EQQPARM dataset, the person(s) adding/updating user-info into EQQPARM ...
8 months ago in IBM Z Workload Scheduler 0 Future consideration

PIF Request/Modify for CSR (Current Plan Special Resource) Interval

CSR (Current Plan Special Resource) Interval should be able to be changed through PIF.
8 months ago in IBM Z Workload Scheduler 0 Future consideration

Reduce vulnerabilities within the the Workload Scheduler / z Workload Scheduler tools by using industry standard password encryption

There is a risk that exploitation of non industry standard password encryption vulnerabilities by a malicious actor could lead to the loss of Customer data and potentially service outage. For example the Windows Agent users password encryption ado...
9 months ago in IBM Z Workload Scheduler 0 Future consideration