Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 227

Options to reduce report created by LTPMA or LTP extend

Running LTPMA (Long Term Plan Modification All) or extend LTP job, does not give you any option to reduce output from LTP. We would like options to reduce the output from these jobs.
8 months ago in IBM Z Workload Scheduler 0 Future consideration

PIF | RC to high while Insertion/Deletion of special resourse usage entrie in operation that already/not exist

While inserting a special resource usage entrie at an operation that already exist (equal SR-name) PIF will end with RC 12. The same is happening while deleting an entrie, that does not exist. Return code 12 is too high and for example an WAPL-scr...
about 5 years ago in IBM Z Workload Scheduler 1 Future consideration

DWC should not be installed in z/OS UNIX in a zFS filesystem with read/write access

Within the current design, we would like to see a clear segregation between the files which REQUIRE write access from the files for which READ access would be sufficient, within the "USERDIR" directory. The standard executables should be delivered...
4 months ago in IBM Z Workload Scheduler 0 Future consideration

Exploit 64-bit addressing mode in zWS

We would like to request the implementation of 64-bit addressing mode for zWS to avoid potential S878 storage-related abends. Our current production zWS controller has a very large and complex batch schedule with a high frequency rate of updates. ...
about 2 years ago in IBM Z Workload Scheduler 2 Not under consideration

Encrypting TWS Zcentric workstation password on Mainframe

Encrypting TWS Zcentric workstation password on Mainframe. Currently we have Set of TWS workstation ID and password saved in PARMFTA userinfo dataset on mainframe to connect to connect to zcentric workstation pn windows This userid and password is...
over 1 year ago in IBM Z Workload Scheduler 1 Future consideration

IWSz Upgrade with zero downtime

Last weekend we migrated IWSz from V9R3 to V9R5.The complete migration took about 1h to complete. Due to the unavailability of IWSz there was some impact on critical batch processing with frequencies smaller than 1h. Today's business requirements ...
over 2 years ago in IBM Z Workload Scheduler 0 Future consideration

Setting restriction for updating job status changes in TWS CP

Please enable the prompt confirmation in TWS panel (5.3) for changing the job status. Currently, there is no prompt confirmation for changing the job status via 5.3 -> M (an operation) -> 6 (General) -> Update status . Due to this, human ...
9 months ago in IBM Z Workload Scheduler 0 Future consideration

Eliminate the TEMPORARY operand of parameter SSCMNAME as it is not necessary and causes many problems

Currently the SSCMNAME can be coded as (EQQSSCMx,TEMPORARY) or (EQQSSCMx,PERMANENT) where x is a subsystem suffix (for instance letter O for 10.1 release). However it is not necessary to have the TEMPORARY option as to go to the different release ...
5 months ago in IBM Z Workload Scheduler 0 Planned for future release

Make it easy to find the scripts needed to create the DB2 history database on a non-z/OS platform (UNIX, LINUX,WINDOWS)

Currently, the DB2 history file definitions for a database on z/OS DB2 are provided in SEQQSAMP while the skips needed for the other platforms are only available in a CD image (ISO) that can be obtained by ordering the zWS product via SHOP z SERIE...
5 months ago in IBM Z Workload Scheduler 0 Future consideration

Running the DWC docker container on Openshift for Z (s390x).

Have the DWC docker container available on Openshift for Z (s390x), with this, I can move my zOS workload console to run on a IFL.
about 2 years ago in IBM Z Workload Scheduler 0 Planned for future release