Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 255 of 8535

zCentric job delays due to

We are looking for an EASIER way (either through EQQAUDIT report, or WAPL or RESTAPI even) of determining when a zcentric job is delayed due to parallel server limitation being exceeded (AND what the limit was set to as users can change the limit ...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Implement a delay before querying a zCentric agent after the workstation became active

When a zCentric workstation goes from Offline to Active status, the controller immediately queries the agent to retrieve the status of the jobs. If the agent does not know the jobs requested by the controller, the latter sets them in UNKN error. ...
about 2 years ago in IBM Z Workload Scheduler 0 Future consideration

OPCOPTS - Parameter REMJCLDIRECTIVES should be set default as YES since it always caused OPC Fetch Directive error if not set to YES

As this Parameter REMJCLDIRECTIVES current default set to NO is an very old design, when we use OPC Fetch Directive, the JCL will always throw error anyway. This mean REMJCLDIRECTIVES(YES) will be mandatory. However, this should also take in cons...
about 2 years ago in IBM Z Workload Scheduler 1 Not under consideration

Panel EQQMMADP should have the same behaviour in filter capabilities as panel EQQMOCCP

If I want to create dependencies via Panel EQQMMADP in the current plan I get back a list with much to much results. In CPs with huge workload this can make EQQMMADP unuseable (several hundreds or thousands of applications in the list) Why EQQMMAD...
over 6 years ago in IBM Z Workload Scheduler 1 Future consideration

Restriction of ALL parameter in the panel EQQSOPGD (ALL DEPENDENCIES)

I hope to create a new parameter to restrict parameter 'Nest Detail' in 'ALL DEPENDENCIES' panel. In the customers' environment, CP lock and high CPU consumption of thecontroller for around 20 minutes occurredbecause they used 'ALL DEPENCENDIES' p...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

EQQUSIN expand job number field and add duration in 100th*sec

Actually the EQQUSIN has a duration limit of 99 hours 59 minutes. We have external jobs with longer durations and need the exact duration in tools like Xinfo. As described in the documentation, the ACT_DUR field has a CHAR size of 4. Updating oper...
over 1 year ago in IBM Z Workload Scheduler 0 Planned for future release

Protect TWS Subresources for ETT, JV, RD and SR with authority group id

Implement the field authority group id for TWS objects ETT, RD, JV and SR and protect the access to the objects via new RACF subresources(the same way as applications with subresource AD.GROUP)
over 8 years ago in IBM Z Workload Scheduler 0 Future consideration

AUTHDEF TRACE ( SAF trace ) needs to be started/stop via command instead of restarting the controller task

Currently to trace security issues in Z workload scheduler it is necessary to alter the controller parms to have TRACE(8) in AUTHDEF, cycle the controller, collect the EQQMLOG, then set TRACE(0) again and cycle the controller again. This makes it ...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

TWSz - Tool needed for localizing cause of Critical Path gap

Tool needed for localizing successor-flow causing gaps in Critical path.
over 4 years ago in IBM Z Workload Scheduler 2 Future consideration

Add an 80% warning message before zWS reaches 100% limit for adding applications of the same name. (EQQM952E & EQQM952I)

To add a 80% alert before an application reaches its limit of 1440 entries to be added. EQQM952E FAILED TO ADD APPLICATION XXXXXXEQQM952I REASON: NO UNIQUE INPUT ARRIVAL TIME LEFT IN CP FOR THIS APPLICATION This will give Scheduling team time to r...
over 1 year ago in IBM Z Workload Scheduler 0 Planned for future release