Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 222

WAPL usage of REXX literal strings causes EQQI232F when FIND results > 250 characters

After selecting applications and operations in the current plan with FIND command, WAPL will substitute the FIND results into a statement via the -@FILTER syntax. WAPL inserts the results of the filter as a REXX literal string. REXX literal string...
almost 5 years ago in IBM Z Workload Scheduler 1 Not under consideration

DSECT should be documented in COBOL

Serviceability
almost 5 years ago in IBM Z Workload Scheduler 0 Planned for future release

Refreshing the subsystem of a controller after a new release

After the installation of a new release, the customer must either do an IPL or restart the controller on EACH lpars to upgrade the subsystem.For instance, on a productive system with 12 lpars and 3 IWS instances, the controllers must be restarted ...
almost 5 years ago in IBM Z Workload Scheduler 1 Future consideration

PIF | RC to high while Insertion/Deletion of special resourse usage entrie in operation that already/not exist

While inserting a special resource usage entrie at an operation that already exist (equal SR-name) PIF will end with RC 12. The same is happening while deleting an entrie, that does not exist. Return code 12 is too high and for example an WAPL-scr...
about 5 years ago in IBM Z Workload Scheduler 1 Future consideration

Apply EELEXIT so it assembles with RC=0 for IATUX19

Regarding "Tivoli Workload Scheduler Distributed - Agent for z/OS V9.4." Regarding EELEXIT. Assembling JES3 exit IATUX19 results in HLASM RC=4 and fails the SMPE APPLY into our zOS/JES CSI which expects HLASM RC=0. Looking at the assembler listing...
about 5 years ago in IBM Z Workload Scheduler 1 Not under consideration

To do a LIST specifying the TIMEDEP as filter

For the "List" action in EQQYCAIN, there isn't any parameter to filter "time dependent"(TIMEDEP) jobs.
about 5 years ago in IBM Z Workload Scheduler 1 Not under consideration

Add Job Confirmation Option to Error Panel

We would like to have the capability in the error panel (HANDLING OPERATIONS ENDED IN ERROR) to have user preference option for job confirmation. This would act like application confirmation today (type Y to confirm you want the application force ...
about 5 years ago in IBM Z Workload Scheduler 1 Planned for future release

IWS z/OS IEFACTRT exit should write messages to JOBLOG instead of SYSLOG

Currently the IEFACTRT exit for TWS z/OS (SEQQSAMP member EQQACTR1) writes WTO messages to the z/OS SYSLOG (OPERLOG) when the restart and cleanup feature is used (RCLEANUP(YESL)) parameter. This can be avoided by using IEFYS instead of WTO.
about 5 years ago in IBM Z Workload Scheduler 0 Future consideration

Change EQQN180W to EQQN180E and terminate NMM immediately

As documented in 65928,L6Q,000 and follow up internal PMR 77462,999,000 there is an easily recreatable way to compromise the integrity of the current plan by overwriting JT files which have not been archived. This needs to be prevented.
about 5 years ago in IBM Z Workload Scheduler 0 Future consideration

ALLDEPS request may lock the corrent plan and cause delays

We have occasionally problem with the query of predecessors (Panel EAASOPSP) : SELECTING APPLICATION OCCURRENCE AND OPERATION INFORMATION option 9.We have implemented the advised solution : a pop up panel reminding that the alldeps query is very (...
over 5 years ago in IBM Z Workload Scheduler 0 Future consideration