Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 262 of 8653

The IWS Restart and cleanup operation can only be performed from an ISPF panel. I want you to be able to perform this operation in a batchjob.

If we want to restart failed batch job, then we should use panel EQQRCLSE on ISPF.We want the failed batch job to be restarted by the batch job instead of from the panel.
about 2 years ago in IBM Z Workload Scheduler 1 Not under consideration

Encryption of the vsam databases

It could be advisable to have the possibility (by parameter of instance) to encrypt all (or some vsam database. only users having the right access to IWSz can access and read the content of the vsam files. there are some non-IBM tool allowing the ...
about 2 years ago in IBM Z Workload Scheduler 0 Future consideration

CPBPLIM should not be allowed to exceed 50% and ALL DEPS nesting level default should be less than 99

The CPBPLIM parameter can have values up to 99 which means 99% of memory is reserved for current plan buffers and 1% is available for everything else. This leads to memory related abends such as S878. Similarly the "NUMBER OF NESTINGS" in panel EQ...
about 4 years ago in IBM Z Workload Scheduler 1 Planned for future release

PIF Request/Modify for CSR (Current Plan Special Resource) Interval

CSR (Current Plan Special Resource) Interval should be able to be changed through PIF.
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Reduce vulnerabilities within the the Workload Scheduler / z Workload Scheduler tools by using industry standard password encryption

There is a risk that exploitation of non industry standard password encryption vulnerabilities by a malicious actor could lead to the loss of Customer data and potentially service outage. For example the Windows Agent users password encryption ado...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

JES2 Release Command (Case TS013137673)

As suggested on case TS013137673 I'm opening this idea. I'm reporting here JES team recommendations: 1. Use of ENF signals for determine job status prior to asking for release 2. Retry the release if job status temporarily does not allow the relea...
over 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Panel EQQMMADP should have the same behaviour in filter capabilities as panel EQQMOCCP

If I want to create dependencies via Panel EQQMMADP in the current plan I get back a list with much to much results. In CPs with huge workload this can make EQQMMADP unuseable (several hundreds or thousands of applications in the list) Why EQQMMAD...
over 6 years ago in IBM Z Workload Scheduler 1 Future consideration

zCentric job delays due to

We are looking for an EASIER way (either through EQQAUDIT report, or WAPL or RESTAPI even) of determining when a zcentric job is delayed due to parallel server limitation being exceeded (AND what the limit was set to as users can change the limit ...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration

Protect TWS Subresources for ETT, JV, RD and SR with authority group id

Implement the field authority group id for TWS objects ETT, RD, JV and SR and protect the access to the objects via new RACF subresources(the same way as applications with subresource AD.GROUP)
almost 9 years ago in IBM Z Workload Scheduler 0 Future consideration

Restriction of ALL parameter in the panel EQQSOPGD (ALL DEPENDENCIES)

I hope to create a new parameter to restrict parameter 'Nest Detail' in 'ALL DEPENDENCIES' panel. In the customers' environment, CP lock and high CPU consumption of thecontroller for around 20 minutes occurredbecause they used 'ALL DEPENCENDIES' p...
over 3 years ago in IBM Z Workload Scheduler 0 Future consideration