Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Z Workload Scheduler

Showing 256

PIF Request/Modify for CSR (Current Plan Special Resource) Interval

CSR (Current Plan Special Resource) Interval should be able to be changed through PIF.
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

Reduce vulnerabilities within the the Workload Scheduler / z Workload Scheduler tools by using industry standard password encryption

There is a risk that exploitation of non industry standard password encryption vulnerabilities by a malicious actor could lead to the loss of Customer data and potentially service outage. For example the Windows Agent users password encryption ado...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

JES2 Release Command (Case TS013137673)

As suggested on case TS013137673 I'm opening this idea. I'm reporting here JES team recommendations: 1. Use of ENF signals for determine job status prior to asking for release 2. Retry the release if job status temporarily does not allow the relea...
about 1 year ago in IBM Z Workload Scheduler 0 Future consideration

The IWS Restart and cleanup operation can only be performed from an ISPF panel. I want you to be able to perform this operation in a batchjob.

If we want to restart failed batch job, then we should use panel EQQRCLSE on ISPF.We want the failed batch job to be restarted by the batch job instead of from the panel.
almost 2 years ago in IBM Z Workload Scheduler 1 Not under consideration

Encryption of the vsam databases

It could be advisable to have the possibility (by parameter of instance) to encrypt all (or some vsam database. only users having the right access to IWSz can access and read the content of the vsam files. there are some non-IBM tool allowing the ...
almost 2 years ago in IBM Z Workload Scheduler 0 Future consideration

Need to filter on Jobs that are NP - NOP oper

There is a need to filter on operations that have been set to NP in panel ID EQQSOPFP. This would be much like filtering on operations set to MH (Manual Hold) NP - NOP (no operation). IWSz will set the status of the operation to complete when the ...
almost 7 years ago in IBM Z Workload Scheduler 0 Planned for future release

Putting module EQQSSCNMx above the line

Due to administrative rules we are forced to run multiple IWSz Systems in parallel on one SYSPLEX. When migrating IWSz we are using BUILDSSX REBUILD and SSCMNAME TEMPORARY to avoid IPLs. After migration we are restarting IWSz with SSCMNAME PERMANE...
over 4 years ago in IBM Z Workload Scheduler 0 Future consideration

One Tracker per LPAR serve all Controller

Due to administrative rules we are forced to run multiple IWSz Systems in parallel on one SYSPLEX. So we have to start tracker STCs for each of our multiple IWSz controllers on every system of the SYSPLEX. As the tracker STCs all do the same work ...
over 4 years ago in IBM Z Workload Scheduler 0 Future consideration

SUBSTR JCL command should support variables with up to 44 chars or allow a continuation with the SETVAR directive

It should be possible to process up to 44 digits within a SUBSTRING command or to allow a continuation within the SETVAR directive. Variables with a value with up to 44 characters are not supported with the SUBSTR JCL function.
over 8 years ago in IBM Z Workload Scheduler 0 Future consideration

CPBPLIM should not be allowed to exceed 50% and ALL DEPS nesting level default should be less than 99

The CPBPLIM parameter can have values up to 99 which means 99% of memory is reserved for current plan buffers and 1% is available for everything else. This leads to memory related abends such as S878. Similarly the "NUMBER OF NESTINGS" in panel EQ...
almost 4 years ago in IBM Z Workload Scheduler 1 Planned for future release