Skip to Main Content
IBM Z Software


This portal is to open public enhancement requests against IBM Z Software products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

GDPS

Showing 182 of 8226

Provide the ability to control when MONITOR1 interval runs.

We would like the ability to control when MONITOR1 interval runs to avoid it running at the same time when we have multiple GDPS K-systems hosted on the same CEC.
7 months ago in GDPS 11 Not under consideration

Exclusively run the Hyperswap 'Phase 1 check', via a Planned/unplanned Hyperswap script.

We would be interested in having a tool (SCRIPT,...) that could be executed before running a Planned/Unplanned HS simulation, and certify whether we are (or not) prepared to be able to perform an HS without causing, for example, the fall of a syst...
8 months ago in GDPS 1 Not under consideration

Simplify the process of extracting volumes in MGM copy.

Good Morning, In environments where GEOPARM is complex, managing extraction of multiple volumes of the MGM copy is complex. The process is very manual (you have to go through GDPS panels to RESUME the disks, then FW the FCs, then delete the GM/GC ...
9 months ago in GDPS 7 Future consideration

In a GDPS MGM TOPOLOGY the KG/KR analyzes if the tertiary disks are ONLINE by any system, before accepting the GDASD START SECONDARY RESTART command.

After a recovery simulation test on the B.RS1 disks (tertiary disk in Region B), we had problems in the synchronization process of the GM copy (GDASD START SECONDARY RESTART command) when having some disks ONLINE from an emergency system (it was u...
9 months ago in GDPS 9 Future consideration

Capacity figure for LCP captures

Would be good to have a capacity used figure for each LCP capture in the GDPS LCP panel. Would help with capacity planning and also give an idea of the amount of time required for a restore. Could either be capacity per capture or a running total ...
10 months ago in GDPS 0 Future consideration

GDPS Reconfiguration Wizard : introduce ability to pause and restart the initial Global Copy

When using the proposed GDPS Reconfiguration Wizard to migrate to a new DS8000, once the new device is defined and we enter the "New DSS Configuration & Mirroring" process, a Global Copy is initiated between the current production box and the ...
11 months ago in GDPS 0 Future consideration

LCP - Some warning should show up in a script in case you do LCP recover from a Partial Backup

LCP captures/Safe Guarded Copy are immutable copies/backups. So we better make sure that these backups are complete - not missing a volume or more. When you start a IBM z Cybervault sysplex, i call it a recovery sysplex, manually or full automated...
11 months ago in GDPS 1 Future consideration

GDPS Ansible Collection for IBM Z

While GDPS has already provided the APIs for integration with customers developed automations or CI/CD pipelines, it would further simplify the use of the GDPS APIs if IBM could provide the GDPS Ansible Collection for IBM Z. Using of Ansible Tower...
11 months ago in GDPS 0 Future consideration

LCP (screen VPCPLCS3) : provide a script to export backup details and allow them to be written to a GDG.

When managing the safeguarded capacity multipliers for volumes in LCP, it would be very helpful to be able to see how exceptional volumes have behaved over the last week or so. Currently the 'EXPORT' command in panel VPCPLCS3, " Logical Corruption...
11 months ago in GDPS 0 Future consideration

Provide a DELETE option for the STOP SECONDARY, and a NOCOPY option for the START SECONDARY script statements

As an MGM4SITE environment with external LCP, we have regular resiliency tests where we failover from one region to the other (REG-A to REG-B). When we do this we have to terminate the copy to the LCP source disk in the old recovery region (REG-B)...
11 months ago in GDPS 0 Future consideration